All industry standard pre-production, production and postproduction paperwork to be handed in at a professional standard to the supervising producer on due dates (80%).
Crewing on other (2nd) production
Students are required to crew on fellow student’s major productions in meaningful roles and in an industry professional manner. Assessment is based on attendance, and industry standard paperwork, specific to that crewing role, submitted on time (20%).